Plans are normally shipped via USPS. For UPS or FedEx delivery, include your shipper account number and specify type of delivery (ground, overnight, etc.). Requests not including type of delivery will be shipped using ground service. We must receive your payment before 1:00 PM, CDST to ship plans out same day. Requests received on Friday will ship on Monday. Be sure to include your company name and contact information including a telephone number and a fax number or email address.

Projects Open for Bids

5160 Street Rehabilitation for the Town of Woodville, AL

Separate sealed bids for street rehabilitation including 10,140 sqyd of bituminous treatment G, 878 tons of superpave bituminous concrete wearing surface layer, 557 tons of superpave bituminous concrete upper binder layer leveling, 455 tons of superpave bituminous concrete upper binder layer patching, 65 tons crushed aggregate base course, 147 cuyd chert, 39 cuyd topsoil, 158 sqft traffic control markings, 11 raise existing manhole cover, 1 replace existing valve box and related items

Project No. SM-CM-PF-18-001

» Plan Holders List

Bid Date: Friday, August 16, 2019 10:00 am

$100 Deposit

4155 DeSoto Falls Area Improvements – DeSoto State Park

Work includes upgrade of existing restrooms and a concession area; concrete slab for ADA accessible picnic area; asphalt paving of parking area; separate parking area covered with crushed aggregate; and, concrete accessible route from parking area to restrooms.

LWCF Project No. 14-LW-1002

DCNR Project No. 28-P-70

BC Project No. 2019053

» Plan Holders List

Bid Date: Tuesday, July 30, 2019 2:00 pm

$160 Deposit

5139 Sidewalk Improvements – Boaz, AL

TAP Project No. – TAPAA-TA16(912)

» Plan Holders List

Bid Date: Tuesday, July 30, 2019 10:00 am

$200 Deposit

5131 Bridge Replacement – Boozer Road, Rainsville, AL

Includes double 12’x12′ concrete box culvert on Boozer Road (County Road 584) over Caney Creek, 59′ in length with concrete wing walls and related items (culvert only, no approach work)

» Plan Holders List

Bid Date: Thursday, August 1, 2019 12:00 pm

$40 Deposit

Recent Projects

4156 Lake Guntersville State Park Campground Improvements / Splash Pad

Lake Guntersville State Park Campground Improvements / Splash Pad

LWCF Project No. 14-LW-1003

DCNR Project No. 50-P-161

BC Project No. 2019051

Bid Date: Thursday, June 27, 2019

2250 Sewer Cleaning and TV Inspection for the Town Oak Grove, AL

Contract No. 1 – Cleaning and TV Inspection of Approximately 27,900 LF of 8″ Gravity Sanitary Sewer Lines for the Town of Oak Grove, AL

Note:  The Documents for this project consists of one volume with maps in the back.  There are not separate plan sheets

Bid Date: Wednesday, May 29, 2019

Awarded to: Jones Utility

4158 Restrooms and Gravel Parking at Weathington Park, Section, AL

Restroom Building and Gravel Parking Facilities at Weathington Park in Section, AL

Bid Date: Tuesday, May 28, 2019

2249 Request for Proposals for the Waterboard of the Town of Sardis City

REQUEST FOR PROPOSALS

WASTEWATER TREATMENT PLANT

FOR THE WATERWORKS AND SEWER BOARD

OF THE TOWN OF SARDIS CITY

Etowah County, Alabama

 

Bid Date: Wednesday, April 24, 2019

Addendums

4161 New Roof for the Centre Police Department, Centre, AL

Bid Date: Thursday, April 4, 2019

Awarded to: GKL Companies, Inc.

1894 Water Main Upgrades – Phase II for the Town of Pisgah, AL

Installing approximately 3,860 LF of 8” CL 200 PVC, 10,100 LF of 6” CL 200 PVC water mains, 4 – 8” gate valves, 5 – 6” gate valves, 3 – 2” gate valves, 1 – 3” gate valves, 9 fire hydrants and 64 service re-connections

Bid Date: Thursday, April 11, 2019

Awarded to: Bolt Construction, LLC

4153 Maintenance Building for the Town of Ragland Waterworks Board

7,500 SF Pre-Engineered Metal Building

Bid Date: Tuesday, April 2, 2019

Awarded to: Goodgame Company

5150 Storm Drainage & Street Rehab for the Town of Reece City, AL

Bidding was canceled.

Bid Date: Thursday, March 21, 2019

Addendums

2247 Pumping Station Replacement for the Hamilton Housing Authority

Replacement of Existing Weston Wastewater Pumping Station including new wetwell, converting existing wetwell to a grease trap, new natural gas generator, fencing and concrete work as well as an alternate bid for installation of 4″ PVC Force Main for the Hamilton Housing Authority in Hamilton, AL.

Bid Date: Tuesday, March 5, 2019

Awarded to: Double Diamond Construction

4154 Playground Renovation at Cheaha State Park

Playground Renovation at Cheaha State Park for the Alabama Department of Conservation and Natural Resources

LWCF Project No. 14-LW-1001

DCNR Project No. 18-P-52

BC Project No. 2019052

Bid Date: Thursday, March 7, 2019

Awarded to: J.A. Dawson Construction

4151 Two Lighted Ball Fields for the Town of Collinsville, AL

Two lighted ball fields including grading and drainage, fencing and backstops, dugouts, underground electrical, lighting, grassing and related items.

Bid Date has been moved to February 19, 2019 per Addendum No. 1

Bid Date: Tuesday, February 19, 2019

Awarded to: Lambert Contracting, LLC

4144 Upgrade of Buck’s Pocket State Park, Grove Oak, AL

Upgrade of Buck’s Pocket State Park to include Campground Improvements, New Bath House and Office Improvements, Grove Oak, AL

RTP Project No. 15-RT-55-01

DCNR Project No. 28-P-69

BC Project No. 2018202

Bid Date: Wednesday, November 28, 2018

Awarded to: K.W. Raines Associates, Inc.

4145 Monte Sano Trailhead Facilities Pavilion – Monte Sano State Park

Monte Sano Trailhead Facilities Pavilion (approximately 31′ x 61′) with Restrooms including Accessible Parking – Monte Sano State Park,  Huntsville, AL

RTP Project No. 15-RT-54-002

DCNR Project No. 47-P-55

BC Project No. 2018397

 

Bid Date: Tuesday, November 27, 2018

Awarded to: Redmond Construction

4143 REBID – Accessible Trail – Guntersville State Park

Accessible Trail from Park Lodge to Mabrey Overlook, Guntersville, AL.

RTP Project No. 14-RT-51-01

DCNR Project No. 50-P-159

BC Project No. 2018039

 

 

Bid Date: Wednesday, November 28, 2018

Awarded to: K.W. Raines Associates, Inc.

5152 Resurfacing and Traffic Stripe – Hokes Bluff, AL

Resurfacing and traffic stripe on Gray Circle, Cedar Ridge Circle, Gilliland Street, 6th Street and Spraggins Street including tack coat, joint sealant, 1,194 tons of superpave bituminous concrete wearing surface, mobilization, traffic stripe, traffic control markings and traffic control  to be completed in 30 working days.

Bid Date: Thursday, November 15, 2018

Awarded to: McCartney Construction Company, Inc.

1893 REBID Water Main Extension / Cutler Ave. & West River Rd. – Mentone, AL

Approximately 4,480 LF 8″ PVC, 4,400 LF 6″ PVC and Related Appurtenances

Bid Date: Thursday, December 6, 2018

Awarded to: Bolt Construction, LLC

5156 Sidewalk Improvements – Federal Aid Proj. No. TAPNU-TA16(917) Grant, AL

Ladd Environmental is managing bids for the Town of Grant, AL on the following project:

Federal Aid Project No. TAPNU-TA16(917)

Commercial and Retail District Sidewalk Improvements in the Town of Grant, AL from 5th Street East to DAR School, Marshall Co., AL

Bid Date: Tuesday, September 18, 2018

Awarded to: Triple J Construction

5142 Resurfacing of Wagner Drive – City of Boaz, Alabama

Re-surfacing of Wagner Drive from SR-205 (N. Main Street) to SR-1 (US-431) for the City of Boaz

The principal items of work are approximately as follows:

Milling/Planing Existing Pavement (20,000 SY), Resurfacing (1,925 Tons), Restriping (6 Mi), and other miscellaneous repairs

State-Funded Project No. IAR-048-000-018

 

Bid Date: Tuesday, May 8, 2018

Awarded to: Reed Contracting Services, Inc.

2241 SRF Wastewater Collection & Treatment Improvements

SRF Wastewater Collection & Treatment Improvements including:

1,450′ of 10″ PVC Force Main,  57′ of 6″ DI Force Main, 32′ of 10″ DI Force Main,  206′ of 12″ DI Force Main, 80′ Bore and Case, 2 Combination Air Release/Vacuum Valves, 6 Plug Valves, 5 Connections to Existing, 12″ Inline Check Valve,  39 Tons of Riprap & Filter Blanket, Pump Station No. 4 Upgrades, Pump Station No. 8 Upgrades, Sewer Vacuum Truck Services, Wetwell Aeration System, (1) 5 HP Floating Aerator, Mobilization, Disinfection System Upgrades and Related Items.

 

Bid Date: Friday, March 30, 2018

Awarded to: Lambert Contracting, LLC

5146 REBID Street Rehab and Storm Drainage for the Town of Paint Rock, AL

including approximately 1,342 tons of superpave bituminous concrete paving, 838 sq. yd. crushed aggregate base course, 454 tons of crushed aggregate, 440′ of ditching, 1 concrete storm sewer inlet, 387 sq. yd. of erosion control blankets, 120′ of 15″ RCP, 85′ of 36″ CHDPE and fittings, 245′ of 42″ CHDPE and fittings, 4 inline drains, 278 tons of riprap, 200′ grade road shoulder, mobilization, erosion and sidement control, testing, 156 sq. ft. of traffic control markings and related items.

Bid Date: Thursday, August 23, 2018

Awarded to: Wiregrass Construction Company, Inc.

To be added to our Advertisement for Bids Notification List, please email your information. You will receive an email with an attached Adobe Acrobat document each time we list a job for bidding. You will need to send a request even if you already receive advertisements from us in printed form. To be removed from the list, please email or phone us and you will be promptly removed.