1933 Waterline Installation for the Jackson Co. Water Authority
Waterline Installation for the Jackson Co. Water Authority includes 145 LF Bore and Case, 1,100 LF of 6" CL 200 PVC Water Main, Valves, Fittings, and Service Connections
Waterline Installation for the Jackson Co. Water Authority includes 145 LF Bore and Case, 1,100 LF of 6" CL 200 PVC Water Main, Valves, Fittings, and Service Connections
Wastewater Lagoon Sludge Removal for the Waterworks & Sewer Bd of the City of Collinsville CW ARPA Project No. CS010921-01
New 250,000 GPD SBR Wastewater Treatment Plat including concrete basins, equipment, piping, aeration, electrical, controls, influent pump station, screening and effluent discharge. Estimate: $2,000,000.00
Gurley Water System Improvements including 4,460’ of 8” PVC Water Main, 50’ of 6” PVC Water Main, 120’ of 8” DI Water Main, 565’ of Bore and Case with 12” Steel Casing, 4 EA 8” Gate Valves, 4 EA 6” Gate Valves, 8 EA Fire Hydrant and Valve, 4 EA 1” Air Release Valve, 7 [...]
Dade County (GA) Water Treatment Plant Filter Media Replacement includes: Removal of Existing Filter Media (4 Filters) and Installation of New Media at Dade County Water Treatment Plant (Labor and Equipment Only)
Contract 3 - Water Main Upgrades for the Town of Sardis City
Sewer System Upgrade for the Town of Leesburg including: 12,700 LF of 4” PVC Force Main, 3,400 LF of 3” PVC Force Main, 1 EA 4” Gate Valve, 2 EA 3” Gate Valve, 6 EA 2” Air Release/Vacuum Valve, 210 LF Bore and Case with 10” Steel Casing (4” PVC Carrier Pipe), 30 LF of [...]
Waterline Upgrades at I-20 Welcome Center for the Cleburne County Water Authority includes 2,950 LF of 8" Ductile Iron Water Line, Master Meter Station and Related Items.
Pinewood Drive Construction (607' long) includes grading, ditching, chert subbase, aggregate base, culverts, topsoil, seeding and related items.
Contract No. 1 includes Upgrade of Pumps, Installation of Auxiliary Generator (Propane) and Automatic Transfer Switch