2282 Wastewater Lagoon Sludge Removal for the Waterworks & Sewer Bd of the City of Collinsville
Wastewater Lagoon Sludge Removal for the Waterworks & Sewer Bd of the City of Collinsville CW ARPA Project No. CS010921-01
Wastewater Lagoon Sludge Removal for the Waterworks & Sewer Bd of the City of Collinsville CW ARPA Project No. CS010921-01
Waterline Relocations include installation of approximately 320 LF of 6” and 8” DI water line, 3 connections to existing system with tapping valves, 1 customer service reconnection, 3 plugging of lines using temporary valves and related items
New 250,000 GPD SBR Wastewater Treatment Plat including concrete basins, equipment, piping, aeration, electrical, controls, influent pump station, screening and effluent discharge. Estimate: $2,000,000.00
Gurley Water System Improvements including 4,460’ of 8” PVC Water Main, 50’ of 6” PVC Water Main, 120’ of 8” DI Water Main, 565’ of Bore and Case with 12” Steel Casing, 4 EA 8” Gate Valves, 4 EA 6” Gate Valves, 8 EA Fire Hydrant and Valve, 4 EA 1” Air Release Valve, 7 [...]
Dade County (GA) Water Treatment Plant Filter Media Replacement includes: Removal of Existing Filter Media (4 Filters) and Installation of New Media at Dade County Water Treatment Plant (Labor and Equipment Only)
Contract 3 - Water Main Upgrades for the Town of Sardis City
Sewer System Upgrade for the Town of Leesburg including: 12,700 LF of 4” PVC Force Main, 3,400 LF of 3” PVC Force Main, 1 EA 4” Gate Valve, 2 EA 3” Gate Valve, 6 EA 2” Air Release/Vacuum Valve, 210 LF Bore and Case with 10” Steel Casing (4” PVC Carrier Pipe), 30 LF of [...]
Waterline Upgrades at I-20 Welcome Center for the Cleburne County Water Authority includes 2,950 LF of 8" Ductile Iron Water Line, Master Meter Station and Related Items.
Hammondville Street Resurfacing includes: 40 SY Removing Concrete Driveway, 1,237 Tons of Superpave Bituminous Concrete Wearing Surface, 547 Tons Superpave Bituminous Concrete Leveling, 82 Tons Superpave Bituminous Concrete Patching, 560 Tons Bituminous Concrete Base Layer, 592 Tons of Aggregate Surfacing, Grading Unpaved CR-756, Removing Existing Pavement and Grading Winston Street, Mobilization and Traffic Control, 52 [...]
Pinewood Drive Construction (607' long) includes grading, ditching, chert subbase, aggregate base, culverts, topsoil, seeding and related items.