1925.1 Contract No. 1 – Pump Upgrade & Generator Installation for Section Waterworks, Sewer and Gas Board
Contract No. 1 includes Upgrade of Pumps, Installation of Auxiliary Generator (Propane) and Automatic Transfer Switch
Contract No. 1 includes Upgrade of Pumps, Installation of Auxiliary Generator (Propane) and Automatic Transfer Switch
Contract No. 2- Infrastructure Upgrades for Raw Water By-Pass Piping includes 16" and 24" Piping, Valves and Fittings DW ARPA Project No. FS010318-01
Water Main Relocation for the Waterworks and Sewer Board of the Town of Sardis City includes: clearing and grubbing and relocation of approximately 1,260 LF 3” or 6” PVC water main, 80 LF of 8” or 10” road bore and case, gate valves, service connections and related appurtenances
Installation of approximately 3,100 LF of 6” CL 350 D.I. piping, valves, fire hydrant, and reconnecting existing services
Contract No. 2 – Water System Rehabilitation and Improvements, Tank Rehabilitation, DW ARPA Project No. FS010407-01. Repainting of Two Elevated Water Storage Tanks (50,000 and 250,000 Gallons) Including Lead Abatement and Miscellaneous Repairs.
Contract No. 1 – Crossville Water Treatment Improvements, DW ARPA Project No. FS010407-01 including removal of existing filter, removal of existing air stripper, removal of existing fence, control/chemical building upgrades, Tonka Dualator III filter, piping upgrades, concrete pads, chemical feed pumps and piping, modifications to existing settling basin, 190 LF of 36” CL 250 DI [...]
Sidewalks along SR-117 from Dempsey Avenue to Moon Lake Library for the Town of Mentone, AL Bracket Estimate: $500,000.00 - $600, 000.00 ALDOT Project No. TAPNU-TA23(904)
Contract 3 - Waterline Installation for Cleburne County Water Authority/ Cleburne County Commission includes Installation of approximately 3,650 LF 2" PVC CL 250 and Related Appurtenances along County Roads 644 and 826
Sewer Rehab - Phase VII for the Town of Collinsville includes Sewer Manhole Rehabilitation, Service Line Replacement, Gravity Sewer Main Replacement, Manholes, Point Repairs, Connection of Customers to Sewer and Related.
SIDEWALK EXTENSION ALONG MAIN STREET, PHASE III – PROJECT NO. TAPNU-TA23(901) THE BRACKET ESTIMATE ON THIS PROJECT IS FROM 600,000 TO 800,000 THIS BRACKET RANGE IS PROVIDED ONLY AS A GENERAL INDICATION OF A BROAD FINANCIAL SIZE CATEGORY FOR THE PROJECT. IT SHOULD NOT BE USED IN PREPARING A BID, NOR WILL IT HAVE ANY [...]