Current Projects

5224 Reeves Rd and Jenkins Road Resurfacing for the City of Hokes Bluff

Resurfacing and Traffic Stripe of Reeves Road and Jenkins Road including 2,560 tons wearing surface, 209 tons patching, 542 tons leveling, 75 tons aggregate surfacing, 720 CY topsoil (loose truckbed measurement), 2 acres seeding, 2 acres mulching, 3 miles solid white class 2, type A traffic stripe, 5 miles solid yellow, class 2, type A [...]

By |2025-09-23T16:52:24+00:00September 11th, 2025|Comments Off on 5224 Reeves Rd and Jenkins Road Resurfacing for the City of Hokes Bluff

5204 Waterline Relocations ay CR 21 Bridge for the Waterworks Bd of the Town of Ragland

Waterline Relocations include installation of approximately 320 LF of 6” and 8” DI water line, 3 connections to existing system with tapping valves, 1 customer service reconnection, 3 plugging of lines using temporary valves and related items

By |2025-09-25T15:53:59+00:00August 14th, 2025|Comments Off on 5204 Waterline Relocations ay CR 21 Bridge for the Waterworks Bd of the Town of Ragland

2280 New Wastewater Treatment Plant for the Town of Crossville

New 250,000 GPD SBR Wastewater Treatment Plat including concrete basins, equipment, piping, aeration, electrical, controls, influent pump station, screening and effluent discharge. Estimate:  $2,000,000.00  

By |2025-09-12T04:19:06+00:00July 17th, 2025|Comments Off on 2280 New Wastewater Treatment Plant for the Town of Crossville

1926 Water System Improvements for the Town of Gurley, AL

Gurley Water System Improvements including 4,460’ of 8” PVC Water Main, 50’ of 6” PVC Water Main, 120’ of 8” DI Water Main, 565’ of Bore and Case with 12” Steel Casing, 4 EA 8” Gate Valves, 4 EA 6” Gate Valves, 8 EA Fire Hydrant and Valve, 4 EA 1” Air Release Valve, 7 [...]

By |2025-09-30T18:10:00+00:00July 3rd, 2025|Comments Off on 1926 Water System Improvements for the Town of Gurley, AL

2277 Sewer System Upgrades for the Town of Leesburg

Sewer System Upgrade for the Town of Leesburg including:  12,700 LF of 4” PVC Force Main, 3,400 LF of 3” PVC Force Main, 1 EA 4” Gate Valve, 2 EA 3” Gate Valve, 6 EA 2” Air Release/Vacuum Valve, 210 LF Bore and Case with 10” Steel Casing (4” PVC Carrier Pipe), 30 LF of [...]

By |2025-09-12T04:18:41+00:00April 15th, 2025|Comments Off on 2277 Sewer System Upgrades for the Town of Leesburg