SIDEWALK ALONG SR-227 FROM GERALDINE HIGH SCHOOL TO SR-75 – PROJECT NO. SRTS-TAPNU-TA24(904)
THE BRACKET ESTIMATE ON THIS PROJECT IS FROM 600,000 TO 700,000.
THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:
SIDEWALK ALONG SR-227 INCLUDING CLEARING AND GRUBBING, 8 EA REMOVING TREES, 600 CY BORROW EXCAVATION, 670 TONS CRUSHED AGGREGATE, SECTION 825, TYPE B, 150 TONS COARSE AGGREGATE, SECTION 801, FOR MISCELLANEOUS USE, 124 LF 18” AND 24” ROADWAY PIPE, 176 LF OF 15”, 18” AND 24” SIDE DRAIN PIPE, 50 TONS SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, PATCHING, 1 LS PEDESTRIAN BRIDGE, 30 LF 8” AND 12” TRENCH DRAIN, MOBILIZATION, 126 TONS LOOSE RIPRAP, CLASS 2, 1,579 SY CONCRETE SIDEWALK, 4” THICK, 958 SY CONCRETE DRIVEWAY, 6” THICK, 56 SF DETECTABLE WARNING SURFACE, 24 SY CURB RAMP, 10 EA PIPE END TREATMENTS, 4 CY MINOR STRUCTURE CONCRETE, 1 EA JUNCTION BOX, TYPE 1, 100 LF STEEL BEAM GUARDRAIL, CLASS A, TYPE 2, 2 EA GUARDRAIL END ANCHOR, TYPE 20 SERIES (MASH), 12 LF STEEL BEAM GUARDRAIL FOR CULVERT, CLASS A, TYPE 2, CASE 3, 100 CY TOPSOIL, 122 SY SOLID SODDING (BERMUDA), EROSION CONTROL ITEMS, 2,000 LF CONSTRUCTION SAFETY FENCE, GEOMETRIC CONTROLS, 239 SF TRAFFIC CONTROL MARKINGS, CLASS 2, TYPE A, 239 SF TEMPORARY TRAFFIC CONTROL MARKINGS, TRAFFIC CONTROL ITEMS AND RELATED ITEMS. THE ENTIRE PROJECT SHALL BE COMPLETED IN NINETY (90) WORKING DAYS.