New 250,000 GPD SBR Wastewater Treatment Plat including concrete basins, equipment, piping, aeration, electrical, controls, influent pump station, screening and effluent discharge.

Estimate:  $2,000,000.00

2 Plan Deposit Options:

  1. Digital ONLY Plans/Specs = $20.00 (non-refundable – see first “buy now” link below)
  2. Both Digital and Hard Copy of Plans/Specs = $250.00 (conditionally refundable – see 2nd “buy now” link below)