Contract No. 1 includes Upgrade of Pumps, Installation of Auxiliary Generator (Propane) and Automatic Transfer Switch
1. Non-refundable Plan Deposit for Digital Only Documents = $20.00 (see 1st link below)
2. Conditionally Refundable Plan Deposit for both Digital and Hard Copy Documents = $100.00 (see 2nd link below)