This project includes resurfacing and drainage improvements along Sewell Ferry Road and Hidden Cove Circle including (Bid Schedule “A”) 5,000’ of ditch excavation, 1,340 CY of borrow excavation, 175 tons crushed aggregate base course, 370 tons crushed aggregate, 100 tons coarse aggregate, 104’ of 18” RCP, 80’ of 24” RCP, 420’ of 15” CHDPE, mobilization and traffic control, 6 EA roadway pipe end treatments, 200 CY topsoil, 2 AC hydroseeding, erosion control items, 50 tons riprap, Class 1 and related items and (Bid Schedule “B”) 543 tons superpave wearing surface, 115 tons superpave binder, 100 tons superpave patching, 329 tons superpave leveling, 295 tons aggregate surfacing, 2 MI solid yellow, Class 2, Type A traffic stripe, 58 SF traffic control marking, 73 pavement markers, mobilization and traffic control and related items for the Town of Cedar Bluff, AL